摘要
中国自20世纪80年代中期开始用现代技术修建混凝土面板堆石坝,至2003年年底已建成和在建的已超过110座,其中坝高超过100m的有31座。文章主要介绍近年来混凝土面板堆石坝建设的若干新进展。
Concrete face rockfill dam started to be constructed using modern technology at middle period of eighties of the 20~th century in China,the ones built and under construction have been more than 110 until the end of 2003,among them there 31 ones which height are more than 100 m.The article introduces several development of concrete face rockfill dam construction in recent years.
出处
《贵州水力发电》
2004年第5期1-4,共4页
Guizhou Water Power
关键词
混凝土面板堆石坝
坝高
修建
近期
中国
建设
建成
现代技术
文章
中期
hydraulic structure,concrete face rockfill dam,prevention and treatment of face cracks,treatment of plinth foundation,design of high retaining wall,inverse-seepage problem