中国混凝土面板堆石坝的近期进展 被引量:23

Recent Development of Concrete Face Rockfill Dam of China
下载PDF
导出
摘要 中国自20世纪80年代中期开始用现代技术修建混凝土面板堆石坝,至2003年年底已建成和在建的已超过110座,其中坝高超过100m的有31座。文章主要介绍近年来混凝土面板堆石坝建设的若干新进展。 Concrete face rockfill dam started to be constructed using modern technology at middle period of eighties of the 20~th century in China,the ones built and under construction have been more than 110 until the end of 2003,among them there 31 ones which height are more than 100 m.The article introduces several development of concrete face rockfill dam construction in recent years.
出处 《贵州水力发电》 2004年第5期1-4,共4页 Guizhou Water Power
关键词 混凝土面板堆石坝 坝高 修建 近期 中国 建设 建成 现代技术 文章 中期 hydraulic structure,concrete face rockfill dam,prevention and treatment of face cracks,treatment of plinth foundation,design of high retaining wall,inverse-seepage problem
  • 相关文献

参考文献2

  • 1CaoKeming,ZhangZhongliang.PerformanceofTianshenqiao1CFRD[].HydropowerandDams.2001
  • 2G. Macedo G,J. Castro A,L. Montanez C.Behavior of Aguamilpa Dam[].J Barry Cooke Volume.2000

同被引文献138

引证文献23

二级引证文献75

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部