摘要
结合湖北电网“十一五”规划研究,探讨了在电网发展到一定阶段时,关于需求侧管理、电磁环网和大容量机组接入系统方式等方面的问题,并相应提出若干建议。
Considering the 11th five-year plan of Hubei power grid,the problems on power system with demand-side management, electric-magnetic loop and large power source were discussed in this paper. Some suggestions about power grid planning have been proposed.
出处
《华中电力》
2004年第5期9-10,14,共3页
Central China Electric Power