期刊文献+

Progress of HIRFL-CSR Vacuum System

Progress of HIRFL-CSR Vacuum System
下载PDF
导出
摘要 The HIRFL-CSR vacuum system progressed steadily during the past year. The 2/3rd of CSR, injection beam line (SSC-CSR, m)'s vacuum chambers were installed in site in Jan. 2003 (Fig.l). The beam diagnostic devices were inserted in the chambers as well. The pressures in unbaked section were kept in 1~5×10^-7 Pa range and in baked section were 2~5×10^-9 Pa.
出处 《近代物理研究所和兰州重离子加速器实验室年报:英文版》 2003年第1期127-128,共2页 IMP & HIRFL Annual Report
基金 SupportbyWTZProjectofBMBF,GermanGovernment.
关键词 HIRFL CSR SSC
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部