利港电厂4号机组采用布莱登汽封的技术改造 被引量:2

Renovation with Blend Glands of Ligang Power Plant's Set No.4
下载PDF
导出
摘要 利港电厂二期3号、4号机组投产后热耗偏高,3号机热力性能考核试验表明:高压缸至中压缸漏汽量较设计值偏大,大修发现大部分汽轴封间隙偏大。通过调研后,在4号机大修期间对高中压缸部分汽轴封进行了布莱登汽封技术改造。运行结果表明:布莱登汽封安全可行,改造后汽封间隙减小,热耗下降,提高了机组效益。 The No. 3 and No. 4 power sets commissioned during the second construction phase of Ligang Power Plant were found to have higher heat consumption than that originally designed. Acceptance tests of set No.3 showed that the steam leakage between the high and the medium pressure casing was larger than given by design caused by excessive clearance existing in most shaft glands as discovered in a later overhaul. In an overhaul of set No.4, Blend glands were used to replace those originally used in the high and the medium pressure parts. With Blend technology, the gland clearances were reduced, heat consumption rate lowered and the set's efficiency improved. This showed the technology to be safe and reliable. Table 1 and refs 3.
出处 《动力工程》 CSCD 北大核心 2004年第6期802-804,共3页 Power Engineering
关键词 动力机械工程 汽轮机 汽轴封 漏汽 改造 汽缸内效率 热耗 power and mechanical engineering steam turbine steam gland steam leakage renovation internal efficiency of cylinder heat consumption
  • 相关文献

参考文献3

  • 1汽轮机/中国动力工程协会.火力发电技术手册第二卷[H].北京:机械工业出版社,1999..
  • 2ASME PTC6.1.汽轮机性能试验规程 [S].[S].美国机械工程协会,1966..
  • 3上海电力建设局技工学校康德编.汽轮机设备安装工艺学[M].北京:水利电力出版社,1992..

同被引文献7

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部