摘要
介绍了三峡电站引水压力钢管下水段用爆炸法消除焊接残余应力的工艺,应力测试方法和检测结果。
The technology of eliminating the wedding residual stress of an inhaul pressure steel tuble in the Three-gorge Hydropower Station by the blasting method is introduced. The stress measurement method and results are analyzed.
出处
《爆破》
CSCD
2004年第4期77-78,82,共3页
Blasting