摘要
结合具体工程实例 ,通过对场地地质条件的分析 ,确定了振冲碎石置换桩的施工方案 ,并就其施工工艺及质量控制措施进行了论述 ,有效提高了地基的承载力 ,效果显著。
Combined with practice and based upon analysis o f field geological conditions the construction plan of vibro-replacement stone column is determined. In this paper its construction technology and quality cont rol measures are introduced, which effectively improved the bearing capacity of foundation and acquired good effects in practice.
出处
《山西建筑》
2005年第1期70-71,共2页
Shanxi Architecture
关键词
振冲碎石置换桩
软弱地基加固
试桩
承载力
vibro-replacement stone column, soft soil foun dation, trail pile, bearing capacity