介绍了按双层集装箱设计的大断面铁路隧道浅埋偏压段及软弱膨胀围岩的施工技术及造价指标分析
This article gives an introduction to the construction techniques and performs a cost index analysis of the shallow seated and unsymmetrical loading section and the weak surrounding rocks of the large-section railway tunneling, of which the design is based on the double-deck containers.
出处
《铁路工程造价管理》
2005年第1期13-15,19,共4页
Railway Engineering Cost Management
关键词
大断面
铁路隧道
施工技术
造价分析
Large section, railway tunnel, construction technique, cost, analysis