期刊文献+

Improving construction performance through supply chain management

Improving construction performance through supply chain management
下载PDF
导出
摘要 A typical model of construction supply chain (CSC) is presented firstly. Then the characteristics and problems of CSC are identified. The authors also describe the progress towards adoption of supply chain management (SCM) in the construction industry. Traditional construction management approaches (CMAs) are compared with new SCM-based CMAs. The authors suggest that integrated SCM based on cooperating competition is crucial to improve construction performance. Based on relevant results from related research, a framework for integrated construction supply chain management (CSCM) is developed to guide the effective implementation of SCM in construction. A typical model of construction supply chain (CSC) is presented firstly. Then the characteristics and problems of CSC are identified. The authors also describe the progress towards adoption of supply chain management (SCM) in the construction industry. Traditional construction management approaches (CMAs) are compared with new SCM-based CMAs. The authors suggest that integrated SCM based on cooperating competition is crucial to improve construction performance. Based on relevant results from related research, a framework for integrated construction supply chain management (CSCM) is developed to guide the effective implementation of SCM in construction.
机构地区 School of Management
出处 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2004年第5期528-532,共5页 哈尔滨工业大学学报(英文版)
  • 相关文献

参考文献10

  • 1O’’BRIENWJ,LONDONK,VRIJHOEFR.Constructionsupplychainmodeling:Aresearchreviewandinterdisciplinaryresearchagenda[].ProceedingsthAnnualConferenceInternationalGroupforLeanConstruction.2002
  • 2MUYAM,PRICEADF,THROPEA.Contractors’’suppliermanagement[].ProceedingsofaJointCIBTriennialSymposium.1999
  • 3SAAD M,JONES M,JAMES P A.Review of the progress towards the adoption of supply chain management(SCM) relationships in construction[].European Journal of Purchasing and Supply Chain.2002
  • 4EDUM-FOTWE F T,THORPE A,MCCAFFER R.Organizational relationships within the construction supply-chain[].Proceedings of a Joint CIB Triennial Symposium.1999
  • 5Vrijhoef R,Koskela L,Howell G.Understanding Construction Chains: An Alternative Interpretation[].Proceedings th Annual Conference International Group for Lean Construction.2001
  • 6MALIK M A,KHALFAN C J,ANUMBA C E,et al.Readiness assessment of the constructing supply chain for concurrent engineering[].European Journal of Purchasing & Supply Chain.2001
  • 7ARBULU R J,TOMMELEIN I D.Alternative supply-chain configurations for engineered or catalogued made-to-order components: Case study on pipe supports used in power plants[].Proceedings th Annual Conference International Group for Lean Construction.2002
  • 8EDUM-FOTWE F T,THORPE A,MCCAFFER R.Information procurement practices of key actors in construction supply chains[].European Journal of Purchasing and Supply Chain.2001
  • 9PALANEESWARAN E,KUMARAASWAMY M,RAHMAN M,et al.Curing congenital construction industry disorders through relationally integrated supply chains[].Building and Environment.2003
  • 10PEARSON A.Chain reaction[].Building.1999

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部