Improving construction performance through supply chain management
Improving construction performance through supply chain management
摘要
A typical model of construction supply chain (CSC) is presented firstly. Then the characteristics and problems of CSC are identified. The authors also describe the progress towards adoption of supply chain management (SCM) in the construction industry. Traditional construction management approaches (CMAs) are compared with new SCM-based CMAs. The authors suggest that integrated SCM based on cooperating competition is crucial to improve construction performance. Based on relevant results from related research, a framework for integrated construction supply chain management (CSCM) is developed to guide the effective implementation of SCM in construction.
A typical model of construction supply chain (CSC) is presented firstly. Then the characteristics and problems of CSC are identified. The authors also describe the progress towards adoption of supply chain management (SCM) in the construction industry. Traditional construction management approaches (CMAs) are compared with new SCM-based CMAs. The authors suggest that integrated SCM based on cooperating competition is crucial to improve construction performance. Based on relevant results from related research, a framework for integrated construction supply chain management (CSCM) is developed to guide the effective implementation of SCM in construction.
参考文献10
-
1O’’BRIENWJ,LONDONK,VRIJHOEFR.Constructionsupplychainmodeling:Aresearchreviewandinterdisciplinaryresearchagenda[].ProceedingsthAnnualConferenceInternationalGroupforLeanConstruction.2002
-
2MUYAM,PRICEADF,THROPEA.Contractors’’suppliermanagement[].ProceedingsofaJointCIBTriennialSymposium.1999
-
3SAAD M,JONES M,JAMES P A.Review of the progress towards the adoption of supply chain management(SCM) relationships in construction[].European Journal of Purchasing and Supply Chain.2002
-
4EDUM-FOTWE F T,THORPE A,MCCAFFER R.Organizational relationships within the construction supply-chain[].Proceedings of a Joint CIB Triennial Symposium.1999
-
5Vrijhoef R,Koskela L,Howell G.Understanding Construction Chains: An Alternative Interpretation[].Proceedings th Annual Conference International Group for Lean Construction.2001
-
6MALIK M A,KHALFAN C J,ANUMBA C E,et al.Readiness assessment of the constructing supply chain for concurrent engineering[].European Journal of Purchasing & Supply Chain.2001
-
7ARBULU R J,TOMMELEIN I D.Alternative supply-chain configurations for engineered or catalogued made-to-order components: Case study on pipe supports used in power plants[].Proceedings th Annual Conference International Group for Lean Construction.2002
-
8EDUM-FOTWE F T,THORPE A,MCCAFFER R.Information procurement practices of key actors in construction supply chains[].European Journal of Purchasing and Supply Chain.2001
-
9PALANEESWARAN E,KUMARAASWAMY M,RAHMAN M,et al.Curing congenital construction industry disorders through relationally integrated supply chains[].Building and Environment.2003
-
10PEARSON A.Chain reaction[].Building.1999
-
1于金伟.建立一体化管理体系 实施CSC 9000T标准[J].纺织标准与质量,2007(1):21-23.
-
2陈跃东.建筑供应链构建及其管理(CSCM)的研究[J].市场周刊,2010,23(8):20-21.
-
3菊田一郎,本刊编辑部,靳伟.耐克(日本)客户服务中心[J].物流技术与应用,2002,7(5):13-20.
-
4健.CSC与太平洋保险签大单[J].中国信息化,2005(8):92-92.
-
5Guide for Authors[J].The Journal of China Universities of Posts and Telecommunications,2012,19(4).
-
6Guide for Authors[J].The Journal of China Universities of Posts and Telecommunications,2014,21(1).
-
7Guide for Authors[J].The Journal of China Universities of Posts and Telecommunications,2014,21(6).
-
8Guide for Authors[J].The Journal of China Universities of Posts and Telecommunications,2014,21(5).
-
9Guide for Authors[J].The Journal of China Universities of Posts and Telecommunications,2014,21(2).
-
10Guide for Authors[J].The Journal of China Universities of Posts and Telecommunications,2012,19(5).