摘要 对杂填土内土钉的受力特点及边坡的位移特性进行了现场试验研究,得出了若干有意义的结果和结论。首次测得并分析了杂填土中土钉的双弓形应变分布形态,指出这是填土边坡中存在2个或以上潜在滑动面的结果;首次测得并分析了土钉临界锚固长度,指出在本试验条件下,其长度约为9 m,并认为临界锚固长度是应变(应力)峰值点、零值点和破坏点同时发生转移而形成,锚固类结构(锚杆、锚索、土钉)均具有此特点。 In-situ testing study on the mechanical behavior of soil nailing and the displacement characteristics of miscellaneous fill slope is carried out. A number of significant conclusions are proposed. For the first time, double arciform strain of the soil nailing is observed in the miscellaneous fill. It is considered as the result that there are two (or more) potential slide planes in the miscellaneous fill. The critical anchorage length is analyzed and determined for the first, which is 9 m in this experiment. The critical anchorage length is formed because of the transfer of the peak value point, the zero value point of the stain (stress) and the wreck point at the same time. It is found out that all anchorage structure (anchor-bolt, anchor-cable and soil nailing) have this characteristic.
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2005年第5期898-904,共7页 Chinese Journal of Rock Mechanics and Engineering
基金 国家自然科学基金项目(50279054)
关键词 地基基础 杂填土 复合土钉 预应力锚杆 基坑支护 Anchorages (foundations) Settlement of structures Slope protection Slope stability Strain
  • 相关文献

参考文献9

二级参考文献18

  • 1李欢秋,张福明,赵玉祥.淤泥质土中锚杆锚固力现场试验及其应用[J].岩石力学与工程学报,2000,19(z1):922-925. 被引量:12
  • 2陈海滨,杨伦全.垃圾处理技术发展预测时两个不可忽略的因素──城市地域和类别的差异[J].环境与开发,1996,11(2):20-24. 被引量:14
  • 3编委会.地基处理手册[M].中国建筑工业出版社,1988..
  • 4温振统.城市固体废弃物填埋场沉降与稳定分析[M].杭州:浙江大学,2000..
  • 5王步云 河北省土建学会地基基础学术委员会.土钉-一种边坡稳定及支挡技术.地基基础学术交流会论文集[M].,1996.1-12.
  • 6甄金环(译),生活垃圾特性分析指南,1990年
  • 7龚晓南,土塑性力学,1990年
  • 8中华人民共和国水利电力部,土工试验方法标准GBJ12 3 - 88,1989年
  • 9芈振明,固体废物的处理与处置,1988年
  • 10阎明礼,地基处理技术,1996年