摘要
肇庆换流站供水工程之一的五尺峡取水泵站施工中 ,在受施工条件限制的情况下 ,采用将钢筋混凝土预制桩改为开口钢管桩 ,将双排桩改为单排桩 ,尝试搭设水上竹平台作沉桩施工平台等措施均取得成功 ,保证了质量、安全、进度 。
In the construction of a certain water supply pumping station for Zhaoqing Convert Station,because of the limited construction condition,we had changed the RC precast piles into Ringent steel pipe piles,and applied the floating bamboo platform for pile-sinking.The practice shows that the techniques have the following advantages:guaranteed the construction quality;safety;fast in construction progress;lower in construction costs;etc.
出处
《三峡大学学报(自然科学版)》
CAS
2004年第6期484-486,共3页
Journal of China Three Gorges University:Natural Sciences