摘要
通过对温州发电厂二期煤场软基堆煤自预压变形的稳定分析和现场实时监测, 获得了大量有实用价值的实测资料及分析研究的成果, 提出了控制变形的措施和方法。
Through the analysis of stability and survey in fieldwork to pre-solid transform by pileuping the coal in the project of Wenzhou Electric Power Plant (phase 2), engineers harvest a lot of valuable materials and results, put forward the plans to control the transform, which are the reference to the later designs and constructions.