摘要
介绍左江水利枢纽电站进口浮式活动拦污排的结构布置特点以及设计中采用的新技术、新方法,并根据运行实践情况,对浮式活动拦污排结构设计中的一些问题进行探讨。
Introduced the structure layout features of the floating active trashrack of hydropower station entry of
the Zuojiang multi-purpose dam project. The adopted new technique and new measures in design were also intro-
duced. Combined with operation and practice situation, some problems of trashrack design were probed into
here.
出处
《广西水利水电》
2003年第B12期53-56,共4页
Guangxi Water Resources & Hydropower Engineering