5Christoforidis M, Aganagic M, Awobamise B, et al. Long- ternmid- term resource optimization of a hydro- dominant power system using interior point method [ J]. IEEE Transac- tions on Power Systems, 1996, 11 (1) : 287-294.
6YuZ, Sparrow F T, Bowen B H, et al. A new long-term hydro production scheduling method for maximizing the profit of hydroelectric systems [ J]. IEEE Transactions on Power Sys- tems, 1998, 13 (1): 66-71.
7Stedinger J R, Sule B F, Loucks D P. Stochastic dynamic programming models for reservoir operation optimization [ J ] . Water Resources Research, 1954, 20 (11) : 1499-1505.
8Piccardi C, Soncini- Sessa R. Stochastic dynamic programming for reservoir optimal control : Dense discretiza- tion and inflow correlation assumption made possible by par- allel computing [ J] . Water Resources Research, 1991, 27 (5) : 729-741.
9Cervellera C, Chen V C P, Wen A. Optimization of a large- scale water reservoir network by stochastic dynamic programming with efficient state space discretization [ J] . European Journal of Operation Research, 2006, 171 ( 3 ) : 1139-1151.
10Mousavi S J, Mahdizadeh L, Afshar A. A stochastic dynamic programming model with fuzzy storage states for reservoir oper- ations [ J] . Advance Water Research, 2004, 27 (11) : 1105-1110.