摘要
本文介绍北京钢铁研究总院与天津铁厂合作,于1987年9月进行的低温烧结矿的工业性试验和高炉冶炼试验研究,试验效果良好,烧结、高炉指标得到改善,两厂合计可获年经济效益380万元。
This paper presents the industrial tests of low temperature sintering and BF operating with such sinters conducted by Central I & S Research Institute in cooperation with Tainjin Iron Works in september 1987. Results of these tests are satisfactory, operating figures of sinter plant and BF are improved and a benefit of total 3.8M(?)/a could be gained.
出处
《烧结球团》
北大核心
1989年第3期6-11,共6页
Sintering and Pelletizing