期刊文献+

立井冻结法凿井工程中的热工计算 被引量:13

Approximate Calculating Method of Some Design Parameters in Drilling Shaft of Artificial Freezing
下载PDF
导出
摘要 本文在分析有关实测资料的基础上,应用近似方法求解了二类边界条件下有相变的平面轴对称的热传导方程,给出了人工冻结凿井设计中用以确定冻结壁交圈时间的相邻两冻结管周围冻结土体轴向相交接的时间、冻结壁形成变化规律、冻结壁平均温度和内外冻结壁厚度关系的近似计算公式。将计算结果与实测资料比较表明,文中所给计算方法和公式有较高的精度。 In this paper,meheat transfre equation of the plane axisymmetrical problem with phase change is approximately solved under second boundary conditon,based on analysising actual bserved data,and it is obtained that the time linked together freezing soil round the nearest two freezing pipes,characteristic of freezing wall developing,average temperature of freezin-ing wali,and formularizing relation between thickness of inside freezing wall and thickness of outside freezing wall of freezing circle,are used in the freezing design,Calculating results are compared with observed data,and it is shown that the accuacy of results obtained with calcu-lating metheod and formulaes in this paper are high.
作者 李述训
出处 《冰川冻土》 CSCD 北大核心 1994年第1期20-30,共11页 Journal of Glaciology and Geocryology
关键词 竖井井筒 冻结法 凿井 热工计算 : freezing wall,freezing circle, average temperature,phase change front
  • 相关文献

参考文献3

  • 1丁德文,科学通报,1982年,27卷,14期
  • 2陈文豹,立井冻结壁形成规律,1981年
  • 3团体著者,特殊凿井,1981年

同被引文献76

引证文献13

二级引证文献76

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部