期刊文献+

下向分层碎石胶结充填采矿法在前河金矿的应用 被引量:6

AN APPLICATION OF DESENDING CUT-AND-FILL WITH CEMENTED FILLING OF CRUSHED ROCK IN QIANHE GOLD MINE
下载PDF
导出
摘要 在这一采矿方法的研究和实践过程中,结合矿山实际情况,从理论分析和室内试验入手,采用进路分层充填结构、黄泥接顶、承载层不设吊筋和锚杆、溜矿井用密集木框支护、无掏糟爆破等项新技术和新工艺,降低了水泥和钢材消耗,简化了工艺流程,改善了充填接顶和爆破效果,提高了生产能力。该采矿方法已在生产中推广应用。 Combined with the mine reality closely , to start with the theoretical analvsisand the laboratory experiment , in the process of resrarch and practice in this miningmethod,the new technology such access slicing structure ,roof contacted with loess,loadedlayers without cables and rock bolts ,ore passes with close timber square seta,and no-cuthole blasting etc. was used to reduce the consumption of cement and steel,simplify thetechnological process, improve the effectiveness of both roof contacted with filling andbladting, and increase the production capacity. This mining method has been deployed inthe mines.
机构地区 长沙矿山研究院
出处 《矿业研究与开发》 CAS 北大核心 1994年第4期7-13,共7页 Mining Research and Development
关键词 金矿 采矿 胶结充填采矿法 碎石 下向分层 Gold mine , Cemented filling method , Crushed rock
  • 相关文献

同被引文献37

引证文献6

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部