摘要
介绍了四川省二滩水电站导流工程分标、河床围堰设计参数的堰体防渗措施、河床截流方法研究和模型试验、导流洞洞口围堰拆除方法、河床截流实施过程以及使用的机械设备。
Scope of this paper is to describe the closure of the Yalong River at ERTAN Hydroelectric Project ,inthe Sichuan Province. We will therefore illustrate the steps leading to the closure and indicate the decisions takenduring the final pLases of the closure in presence of moiJified conditions.
出处
《水电站设计》
1994年第1期18-27,共10页
Design of Hydroelectric Power Station
关键词
河床截流
立堵截流
水力发电站
ERTAN Hydroelectric ProJect ,river closure ,end dumping , transverse durnping ,cofferdarn bridge.