摘要
陕南梯地垮坎,以黄褐土山地坡改梯最为严重,一般当年修的梯地在翌年雨季中有30%~40%梯坎出现崩塌或滑塌。从1989年以来,在陕南一些地方曾试验过挡板法、掺沙法和塑料编织袋法筑坎修地,但收效甚微。梯坎难以巩固的原因有六个方面:1.土壤含粘量高,排水能力差;2.雨多强度大;3.地面坡度陡;4.筑坎质量不高;5.排水系统不完善;6.没有采取植物护埂措施,甚至破坏地边埂。实践证明:任何单一措施都不能从根本上解决陕南土坎梯地垮坎问题,必须进行综合治理。应建立以排水固坎为中心,坡面工程措施与植物措施相结合,治理与开发相结合的综合防治体系,这是防治土坎梯地垮坎的有效途径。
The collapse of terrace-bank in South Shaanxi province,especially terracing on the slope with distribution of yellow cinnamon soil is serious. Generally,about 30% ̄40% percent of the terrace conseructed in the year will collaps e orslide in the rainy-season in the next year. In some of places trial methods of conseructing terrace-bank such as retaining-plank,adding sand to clay soil,woven plastic bags have been tested and proved to be little effect. The reason which terrace-bank is difficult to stabilize are as follows: 1. Higher clay contents in soil and lower water drainge capacity; 2.Rich rainfall and high rainfall intensity; 3. Steep slope gradient; 4. No vegetation measures to protect terrace-bank even distroing the ridge of terraced field; 5. Poor construction quality of terrace-bank; 6. Imperfect water drainge system. It has been tentified by practie that no single measure can throughly solve the problem of collapse of terrace-bank in South Shaanxi province,and comprehensive harnessment is essential. It is an efficient way of controlling collapse of terrace-bank to establish comprehensive controlling system which focuses on water drainge and terrace-bank steadiness,combines slope control engineering with vegetation,combines harnessment with exploitation.
出处
《水土保持通报》
CSCD
北大核心
1994年第3期44-47,共4页
Bulletin of Soil and Water Conservation
关键词
陕南
土坎梯地
土壤侵蚀
防治
South Shaanxi
yellow cinnamon soil
terrace
control measures