摘要
叙述了国家863计划项目示范工程—江阴苏龙发电有限公司夏港发电厂2×135MW机组烟气脱硫工程的总体设计,包括FGD各分系统的选择和设计特点,工艺和系统控制过程。同时还介绍了该工程的施工安装、设备选择、调试和运行的特点以及技术经济指标。近1年的运行实践表明,该工程连续满负荷运行5000h,运行保证率不低于95%,脱硫效率稳定在99%以上,完全达到了863示范工程规定的目标。
Overal design of the system, including the subsystem selection, design characteristics, system control etc, for national 863 sample project, a FGD engineering of 2×135MW units in Xia Gang Power Plant is described. The system installation, equipment selection, shakedown test, operation, technological and economical characteristics are also introduced. The operation practice in almost a year indicates that the guaranteed operation rate is not low than 95% and the desulfurization efficiency is stable over 99%. It absolutely meets the requirement of 863 sample project.