期刊文献+

大跨度斜拉桥施工过程中的主梁节段自重识别 被引量:16

IDENTIFICATION OF SELF-WEIGHTS OF SEGMENTAL GIRDERS DURING THE CONSTRUCTION PROCESS OF A LONG-SPAN CABLE-STAYED BRIDGE
原文传递
导出
摘要 在大跨度斜拉桥的悬臂施工过程中 ,主梁节段自重的准确识别是保证斜拉桥结构成功修建的基础工作。本文研究从实际施工的角度出发 ,引入施工相关性的考虑 ,结合系统重构 ,建立了一套具一般意义的针对主梁节段自重参数识别问题的递进识别算法。崖门大桥的实桥计算表明 ,通过考虑实际施工中的相关信息 ,该算法不仅能对主梁节段自重进行有效的识别 ,还具有良好的预测功能 。 During the cantilever construction process of a long-span cable-stayed bridge, it is essential to accurately identify the self-weights of segmental girders for understanding and control of the structural behavior. In this paper, from the point of view of practical construction, the concept of construction correlation is introduced,in combination with system rebuilding,and a general sequential estimation formula is established for identifying the self-weights of segmental girders.The proposed formula is applied to the construction of Yamen Bridge, and the numerical results illustrate that, in consideration of construction correlation, the proposed formula can accurately identify the pre-construction self-weights and effectively predict the post-construction self weights.
出处 《土木工程学报》 EI CSCD 北大核心 2005年第2期68-74,80,共8页 China Civil Engineering Journal
基金 广东省自然科学基金资助项目 (0 0 0 387)
关键词 斜拉桥 施工控制 参数识别 随机场 cable-stayed bridge construction control parameter estimation random field
  • 相关文献

参考文献10

  • 1苏成,范学明.考虑材料与荷载变异时崖门大桥施工阶段随机分析[J].桥梁建设,2003,33(1):62-65. 被引量:13
  • 2Tomaka, H., and Kamei, M. Cable tension adjustment bystructural system identification [ C ]. International Conference on Cable-stayed Bridges, Bangkok: Asian Institute of Technology, 1987, 856-868.
  • 3Kalman, R. E. A new approach to linear filtering and prediction problems [J]. J. Basic Engrg., 1960, 82 (1): 35-45.
  • 4Hoshiya, M., and Sutoh, A. Kalman filter-finite dement method in identification [J]. J. Engrg. Mech., ASCE,1993, 119 (2): 197-210.
  • 5Ghanem, R., and Shinozuka, M. Structural system identification h theory [J]. J. Engrg. Mech., ASCE, 1995, 121(2): 255-264.
  • 6$akai, F., Isoe, A., and Umeda, H. A new methodology for control of construction accuracy in cable-stayed bridges [ C].Proceeding of 3rd East Asian-Pacific Conference on Structural Engineering and Construction, Shanghai, China, 1991.
  • 7Sorenson, H. W. Parameter estimation: principles and problems [M]. New York: Dekker, 1980.
  • 8华南理工大学城市建设研究中心.广东省西部沿海高速公路崖门大桥施工监控工作总结[R].,2003..
  • 9韩大建,苏成,王卫锋.崖门大桥施工监控的技术流程与主要成果[J].桥梁建设,2003,33(1):5-8. 被引量:15
  • 10.GB/T 50283—1999,公路工程结构可靠度设计统一标准[s].[S].北京:中国计划出版社,1999..

二级参考文献4

共引文献26

同被引文献68

引证文献16

二级引证文献75

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部