期刊文献+

基于模块化思想的拆卸序列规划 被引量:28

Disassembly Sequence Planning Based on Modularization
下载PDF
导出
摘要 针对在产拆卸序列生成过程中因零件数目过多面造成的组合爆炸问题 ,提出了一种基于模块化思想的拆卸序列生成方法 ;建立了模块化产品拆卸模型 ;自动生成了产品的层次网络图 ;并针对层次网络图进行了优先约束分析 文中介绍了产品拆卸序列的生成过程 。 Exponential explosion during the process of disassembly sequence generation has become a bottleneck for a long time due to over large number of parts included in the product. To solve this problem, an approach based on the modularization is proposed in the paper to generate the disassembly sequence. In the approach, we construct a modularization disassembly model where the Hierarchy Network Graph of product is created automatically. The precedence constraints related to the hierarchy network graph are analyzed, and the process of generating the disassembly sequence is described. A case study is also given to show that the method is feasible and effective.
出处 《计算机辅助设计与图形学学报》 EI CSCD 北大核心 2005年第3期498-504,共7页 Journal of Computer-Aided Design & Computer Graphics
基金 国家自然科学重点基金 (5 993 5 12 0 ) 安徽省自然科学基金 (2 0 0 2 2 0E2 )
关键词 拆卸序列 组合爆炸 模块化 层次网络图 优先约束 exponential explosion disassembly sequence modularization hierarchy network graph precedence constraints
  • 相关文献

参考文献5

  • 1Boldin D F, Abell T E, Lui M C M, et al. An integrated computer aid for generating and evaluating assembly sequences for mechanical products[J]. IEEE Transactions on Robotics and Automation, 1991, 7(1): 78~94
  • 2Fazio T L D, Whitney D E. Simplified generation of all assembly sequences [J]. IEEE Journal of Robotics and Automation, 1987, 3(6): 640~658
  • 3Mello L S H, Sanderson A C. AND/OR representation of assembly plans[J]. IEEE Transactions on Robotics and Automation, 1990, 6(2): 188~199
  • 4Chen C L P. Neural computation for planning AND/OR precedenceconstraint robot assembly sequences[A]. In: Proceedings of International Joint Conference on Neural Networks, Como, Italy, 1990. 127~142
  • 5潘晓勇,骆祥峰,刘光复,刘志峰,王淑旺.基于层次概率模糊认知图的产品拆卸序列研究[J].机械工程学报,2003,39(4):6-10. 被引量:15

二级参考文献6

  • 1Lambert A J D.Optimal disassembly of complex product.Int.J.Prod.Res.1997,35(9):2 509-2 523.
  • 2Lozano-Perz T,Wilson R H.Assembly sequencing for arbitrary motion.In:IEEE Proceeding of Robotics and Automation,1993.
  • 3Kuo Tsaic,Zhang H C.Disassembly analysis for electromechanical products:a graph—based heuristic approach.International Journal of Production Research,2000(38).993-1007
  • 4Satur R,Lm Z Q.A contextual fuzzy cognitive map framework for geographic information systems.In: IEEE Transactions on Fuzzy Systems,1999(7):10~13.
  • 5Carvalho J P,Tome J A B.Rule based fuzzy cognitive maps—a comparison with fuzzy cognitive maps.In:Proceedings of the NAFIPS99,USA,1999.
  • 6Stylios C D,Groumpos P P.A soft computing approach for modeling the supervisor of manufacturing systems.Journal of Intelligent and Robotic Systems,1999(26):389-403.

共引文献14

同被引文献213

引证文献28

二级引证文献183

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部