经过试验分析,制定出新抚钢30 t高功率电弧炉合理供电制度,优化了30 t电炉的电气运行,改善了生产技术指标,取得了显著的经济效益。
The optimum power supply schedule for 30 t HP-EAF at Xinfu Steel has been drawn up through tests and analysis. As the results the operation of the electrical equipments for the HP-EAF is optimized and technical index of production improved, and thus prominent economic benefits achieved.