摘要
介绍了在J2EE平台下开发矿井采掘计划编制系统的系统结构,并构造出面向对象的采掘接替专家系统以对采掘接替关系进行推理,同时根据实际需要对采掘计划进行检验、调整和统计分析,最后给出了一个采掘计划编制的应用实例.
In this paper,the whole system architecture of coal mining plan based on J2EE has been put forward. The system constructs the object_oriented expert system to deduce the mining sequence.According to the production requirement,the mining plan system can verify and dynamically adjust plan rapidly.The application of the system in some coal mines results in obvious economic and social benefits.
出处
《河南理工大学学报(自然科学版)》
CAS
2005年第1期25-29,共5页
Journal of Henan Polytechnic University(Natural Science)