预应力管桩单桩极限承载力时效性研究 被引量:3

STUDY ON TIME EFFECT OF ULTIMATE BEARING CAPABILITY OF SINGLE PIPE PILE
下载PDF
导出
摘要 在深入分析了浙江沿海地区桩周土的静探侧摩阻力平均值、静探锥尖阻力平均值与休止期关系的基础上,推导了单桩初始极限承载力的计算公式,给出利用静载试验值来确定静载试验值对应的单桩极限承载力的方法。运用数理统计的回归拟合方法,得出能够比较准确反映单桩极限承载力增长率与休止期关系的规律,结果表明与实测工程数据相当吻合。 Based on the deep analysis of the relationship between the average value of side detecting friction resistance,the average value of end detecting resistane and fallow time,a mathematical expression for calculating the ultimate bearing capacity of a single pile is proposed.The approach to calculate the bearing capacity with the test result is presented.By using the recursive method of statistics,the relationship between the ultimate load bearing capacity of a single pile and fallow time is approximated.Through that mathematic analysis,the low of the increasing ultimate bearing capability of single pile is educed,which may be of reference for engineering practices.
出处 《低温建筑技术》 2005年第2期66-68,共3页 Low Temperature Architecture Technology
关键词 预应力管桩 单桩极限承载力 休止期 时间效应 reinforced pipe pile ultimate load bearing capacity of a single pile time of repose time effect
  • 相关文献

参考文献5

二级参考文献22

  • 1俞昌铭(译).热传导[M].北京:高等教育出版社,1983.7.
  • 2桩基工程手册编写委员会.桩基工程手册[M].北京:中国建筑工业出版社,1998..
  • 3浙江大学岩土工程研究所.温州电厂^#2、^#6煤场工程试验研究报告[M].杭州:浙江大学,2000..
  • 4周健 徐建平 许朝阳.群桩挤土效应的数值模拟[J].同济大学学报,2001,29(1):34-35.
  • 5张诚厚.两种结构性黏土的土工特性[J].水利水运科学研究,1983,14:65-71.
  • 6.JGJ 94-94.建筑桩基技术规范[S].,..
  • 7陶宗禄 等译.桩土相互作用[M].上海:交通部第三航务工程局科研所,1993..
  • 8[11]Renato E. B. & Kael R.. Tunnel design and construction in extremely difficult ground conditions, Tunnel, 1998(8): 23-31.
  • 9[12]Yi X.and other. Observed and calculated pore pressure and deformations induced by an earth balance shield[J]. Can. Geotech. J., 1993, 30(3): 476-490.
  • 10[13]Romo M. R., Elements induced by soft ground tunneling[C]. Inter. Conf. On Case Histories in Geotech. St. Louis Missouri:Engrg.,1984.

共引文献64

同被引文献24

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部