根据沙角C电厂2 100 t/h锅炉设备的结构特点,结合设计数据、设备状况、运行调整等多方面分析了锅炉结焦的主要原因,通过试验并综合现场实际对结焦问题提出了改进措施并付诸实施。
In accordance with the structure feature of 2 100 t/h boiler of Shajiao C Power Plant and in connection with the design data,equipment state,operation adjustment and so on,the main coking cause of burner was analyzed.Through test and comprehensive analysis on its operation condition,innovation measure was put forward and performed.