摘要
分析了产生液化大变形的机理和影响液化大变形发生发展的因素,对碎石桩进行液化处理的现状进行了阐述,提出了用碎石桩处理地基液化大变形的设计方法。
The mechanism and the factors which could affect the large ground displacement of liquefaction are studied comprehensively and the gravel column’s applications in liquefied soil improvement are summarized; The design of gravel column in liquefied soil improvement is brought up.
出处
《山西建筑》
2005年第12期83-84,共2页
Shanxi Architecture
关键词
碎石桩
液化
大变形
gravel column, liquefaction, large ground displacement