岩溶隧道施工因其工程地质和水文地质的复杂和特殊而异常困难,本文结合新建渝怀铁路圆梁山隧道施工实践,试图探索隧道岩溶及岩溶水的处理途径和高压富水岩溶隧道的施工技术。
It is unusually difficult for the karst tunnel to construct, because its project geology and hydrogeology are complicated and special. Based on the construction of Yuanliang Mountain tunnel on Yuhuai railway, the author researches on the solutions of tunnel karst, karst water and the construction technology of the karst tunnel with high pressure and abundant water.