摘要
在青藏铁路钻孔桩施工过程中,通过使用先进的机械设备和科学合理的施工组织安排,以及重点工序的质量控制,既提高了工作效率,又保证桩基质量、确保了施工工期。简要介绍了钻孔桩施工工艺及工程的质量控制等内容。
In the course of the bored pile construction of Qinghai-Tibet Railway, through applying the advanced mechanical equipment and the scientific and rational construction organization and the quality control of the major processes, the working efficiency was increased, the pile foundation quality and the construction period were guaranteed. This paper briefly introduces the construction technique of the bored pile, and the quality control of the engineering, etc.
出处
《科技情报开发与经济》
2005年第10期288-289,共2页
Sci-Tech Information Development & Economy
关键词
钻孔桩
施工组织
质量控制
青藏铁路
bored pile
construction organization
quality control
Qinghai-Tibet Railway