龙滩大坝混凝土供料线及塔(顶)带机性能测试试验

Tests on the performances of material supply line and tower belt conveyor and the construction
下载PDF
导出
摘要 通过对龙滩水电站大坝混凝土供料线及塔(顶)带机的设备运行测试试验,找出碾压混凝土浇筑时放料、输送、仓面施工三个环节的衔接关系,以及这种新工艺运用于碾压混凝土坝浇筑的施工特点和施工方法,从而对该工艺给予一个正确评价,同时通过该试验,对设备进行性能验收。 The performance tests on the material supply line and tower belt conveyor of Longtan dam were carried out to find out the relationship among the concrete pouring, transportation and construction of RCC, as well as to get the construction characteristics and methods of such new technique in the placement of RCC, in order to make a correct evaluation on such technique. At the same time, the tests also can help to conduct the performance acceptance of the equipment.
出处 《水力发电》 北大核心 2005年第4期62-64,共3页 Water Power
关键词 供料线 塔(顶)带机 性能测试 仓面施工 碾压混凝土 龙滩水电站 material supply line tower belt conveyor performance test concrete construction RCC Longtan Hydropower Station