摘要
基于常规热平衡方法和等效热降基本理论,研究压水堆核电机组二回路热力系统高压抽汽和高压再热抽汽的耦合特性,推导出压水堆核电二回路系统汽轮机功率和各种辅助汽水成分进(出)二回路热力系统的分析计算模型,并对900MW压水堆核电机组二回路热力系统进行了实例计算,所得结果与常规热平衡法完全相同.
The coupling properties of the high pressure drawing steam and the high pressure reheat drawing steam are analyzed; and the analytical calculating model of steam turbine power and auxiliary steam-water system for the secondary-circuit system of a PWR nuclear power plant is developed ,based on the normal energy balance method and basic theory of equivalent heat drop. The calculation result of a 900MW PWR nuclear power plant secondary-circuit system by these methods are identical completely.
出处
《武汉大学学报(工学版)》
CAS
CSCD
北大核心
2005年第3期141-144,共4页
Engineering Journal of Wuhan University
关键词
压水堆
核电汽轮机
功率
计算
pressurized water reactor (PWR)
nuclear power steam turbine
capacity
calculation