摘要
因工程地质及施工单位桩机选择的原因,造成静压桩出现大范围的断桩,通过对事故原因的分析,对断桩采取合理的处理方法,经事故处理后的桩位检测及工程施工后的沉降观测,达到设计要求的可靠度,取得可观的社会效益,对类似工程事故有一定的参考价值。
This paper analyzes breaking accident of static pile due to geological cause and piling machine, gives rational treatment methods proofed by measuring and settlement observation, to make it meet the design requirement of reliability to achieve a social benefit. The paper has a reference value to similar accidents.
出处
《平顶山工学院学报》
2005年第2期71-73,共3页
Journal of Pingdingshan Institute of Technology