摘要
简述合同段内浅层气的分布情况,分析浅层气对桥梁施工的影响,拟定采取的施工前地质钻孔释放措施,同时针对浅层气在桥梁钻孔桩基础施工中引发问题提出解决措施。
The distribution of shallow-buried gas in the Contract Section is introduced and its influence on bridge construction is analyzed. Intended pre-construction gas release through geological drilling and corresponding measures to solved the problems caused by the gas are discussed.
出处
《石家庄铁道学院学报》
2005年第B06期34-36,共3页
Journal of Shijiazhuang Railway Institute
关键词
桥梁施工
桩基础施工
浅层气
排放措施
bridge construction
pile foundation construction
shallow-buried gas
release measures