摘要
从施工现场管理的角度,论述了在施工中运用价值工程的意义。并结合实例分析实现对建设项目施工与价值工程两个方面综合考虑,从而优化施工工程方案,结果显示该方法是有效的,并对施工人员提出了相应要求。
Form the perspective of the spot management, the significance of employing value engineering(VE) in construction in hydraulic project is discussed by analyzing an example, consider two of aspects: construction and value engineering, and come to optimize the construction scheme, the result of the method of the paper is efficient; and some advices are put forward by writers.
出处
《水利科技与经济》
2005年第7期385-387,共3页
Water Conservancy Science and Technology and Economy
关键词
价值工程
水利工程
施工
优化
应用
value engineering
water resource project
construction
optimizing