摘要
三界怒江大桥,主桥跨径布置为55m+138m+95m,为非对称连续刚构,在国内尚属少见。本文重点介绍该桥设计与施工的关键技术。
The frame of Sanjie Bridge over Nujiang River is an asymmetric continue rigid frame which is unusual in China and its spans of the main bridge is 55+138+95 meters. In this paper, the key technology of this bridge in design and construction is emphatically introduced.
出处
《公路》
北大核心
2005年第7期15-19,共5页
Highway
关键词
三界怒江大桥
非对称连续刚构
双薄壁墩
设计
Sanjie Bridge over Nujiang River
asymmetric continuous rigid frame
double thin-walled pier
design