摘要
就蓟县台小辛庄山洞形变的抽水干扰,在抽水实验的基础上,研究了抽水干扰的机理及其规律,为形变台站减小抽水干扰的影响提出了可行性建议。
Author made a study on water-pumping disturbance to the deformation observation in Xiao Xin Zhuang Cave of Jixian Seismic Station.On the basis of water pumping experiments,we studied the mechanism and regular pattern of the water-pumping disturbance and offered a feasible proposal on how to diminish its influence on the deformation observation.
出处
《地震地磁观测与研究》
1995年第4期75-80,共6页
Seismological and Geomagnetic Observation and Research
基金
国家地震局科技监测司"地震监测
预报
科研"三结合专项经费资助
关键词
固体潮
地震观测
地震台
变形观测
抽水实验
water pump-injection earthquake,earth tide,water-bearing bed,water-resisting layer,zero drift