摘要
漳州战备大桥主桥为 (80 .8+ 132 .0 + 80 .8)m双塔单索面三跨连续部分斜拉预应力混凝土箱梁桥 ,介绍其主桥斜拉索的布置、体系构造以及受力。
Zhangzhou War Preparation Bridge is a 3-span partial cable-stayed prestressed concrete box girder bridge with two towers and single-cable-plane. The attribution of main bridge stay cables and its system structure and loading are introduced.
出处
《桥梁建设》
EI
CSCD
北大核心
2002年第1期8-10,共3页
Bridge Construction
关键词
部分斜拉桥
斜拉索
构造
索鞍
桥梁设计
partial cable-stayed bridge stay cable structure, cable saddle bridge design