摘要 为保证主厂房水平薄层灰岩岩壁吊车梁岩台的成型,使超欠挖控制在技术条款要求的范围之内,进行了生产性钻孔爆破试验。试验结果表明,爆破效果达到了设计技术要求。 In order to guarantee the formation of the rock-bench for the crane-beam on the horizontal thin-layer limestone rock wall in the main power house and ensure the over or under excavation to be controlled within the specified limit in the technical specifications concerned ,the productive drilling and blasting tests are carried out. The test results indicate that the blasting effect has met the requirement of the design specification and then the initially-selected blasting parameters can be used in the actual excavation as well.
作者 郝竹林
出处 《水利水电技术》 CSCD 北大核心 2005年第7期76-77,共2页 Water Resources and Hydropower Engineering
关键词 主厂房 岩壁吊车梁 岩台爆破试验 西龙池抽水蓄能电站 爆破试验 岩台 薄层灰岩 技术条款 试验结果 技术要求 main power house rock wall crane-beam rock-bench blasting test Xilongchi Pumped-storage Hydropower Station
  • 相关文献

同被引文献12

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部