摘要
梁9-平1井位于梁家楼油田中区西部,东临纯56块,目的层为沙三中油层。该井为二靶点水平井,钻探目的是开发梁9断块西部沙二中构造高部位剩余油,该井设计井深3076.43 m,实钻水平段长337.37 m,完钻层位S3段,完钻原则是B靶中靶后留足35 m口袋完钻。由于井身结构设计合理,井眼轨迹控制方法得当,且采用了MWD+电阻率测试仪的轨迹跟踪测量技术,加之技术保证措施正确,各方面配合密切,从造斜点开始一趟钻钻达A点,仅用26 d完钻,取得了较好的经济效益和社会效盖。
Liang9-ping1 well is located in west of Liangj ia lou Oilfield middle area,it's east near Chun56 block,production formation is S 3.This well configuration of is two target point horizontal well. Residual oil i n Liang9 block exploitation is the main purpose of drilling.the well design dept h is 3076.43 m,horizontal interval is 337.37 m,measured layer is S3.Due to ho le trajectory design accurate,well path control method suitable and using MWD+ r esistivity logging instrument,This well was successfully drilled from build up p oint to A target, the net drilling time is only 26 d,and has better economic ben efit and social benefit.
出处
《石油钻采工艺》
CAS
CSCD
北大核心
2005年第4期9-11,共3页
Oil Drilling & Production Technology