DTS在三峡工程混凝土温度场监测中的应用 被引量:9

Application of DTS to monitoring of concrete temperature field in Three-Gorges Project
下载PDF
导出
摘要 以DTS实测三峡工程大体积混凝土温度,分析了混凝土温度场水化热阶段、二峰阶段、平稳阶段的特点,指出水化热是大体积混凝土温度应力产生的重要因素;由于内部集热,混凝土浇筑1个多月后会出现第二次温度峰值;大体积混凝土经过一个季度的温度变化过程后逐渐趋向平稳,环境温度对平稳阶段混凝土表层温度有一定的影响.DTS测温成果较好地证实了三峡工程大体积混凝土温度场变化的阶段性和规律性. Based on the temperature data of mass concrete in the Three-Gorges Project measured with the Distributed optical fiber Temperature monitoring System (DTS), an analysis was made of the characteristics of the three-stage temperature variation of mass concrete during the pouting process, including the hydration heat stage, the second peak stage and the stable stage. Some conclusions were summarized as follows: hydration heat is an important factor leading to concrete stresses; after a month of concrete pouring, the second temperature peak will occur suddenly due to the inner heat concentration; the temperature of mass concrete tends to become stable a quarter later, and the environmental temperature is of certain influence on the surface temperature of concrete at the stable stage. The measured data of temperature with DTS confirms the stage variation of temperature field and its regularity of mass concrete in the Three-Gorges Project.
出处 《水利水电科技进展》 CSCD 北大核心 2005年第4期30-32,35,共4页 Advances in Science and Technology of Water Resources
基金 国家自然科学基金资助项目(59879002) 国家电力公司重大项目(SKPJ007-09)
关键词 DTS 大体积混凝土 温度场变化 三峡水利枢纽工程 DTS mass concrete temperature field variation Three-Gorges Project
  • 相关文献

参考文献2

二级参考文献1

  • 1三峡水利枢纽混凝土工程温控研究编委会.三峡水利枢纽混凝土工程温控研究[M].北京:中国水利水电出版社,2001..

共引文献1

同被引文献52

引证文献9

二级引证文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部