摘要 对现浇钢筋混凝土建筑结构施工期间,模板支撑系统架设中可能存在的薄弱层对施工荷载分布的影响,提出了简化分析方法,并用工程实测结果进行了验证,表明模型计算结果的正确性。分析表明,模板支撑薄弱层将导致模板支撑薄弱层的上部楼板承担的施工荷载增大,而模板支撑薄弱层下部楼板承担的施工荷载减小;实测表明,模板支撑薄弱层上的楼板承担的施工荷载同比增大约4.3%,薄弱层下的楼板承担的施工荷载减小约3.9%。施工期间应避免模板支撑薄弱层的出现,以防模板支撑薄弱层可能带来的风险。 Newly placed reinforced concrete structures during construction generally are supported by formwork, which transfers concrete deadweight and live loads to the placed RC floors. This temporarily load-carrying structure which consists of early-stage concrete structures and formwork is time-dependent. Its form, material property and space location all continuously vary with construction progress. In the analysis of the time-dependent structure, spacing uniformity and unchanged position of shores in upper and down level are generally assumed, but in practice there is formwork which is not consistent with that of shores in upper and down layers. This results in redistribution of construction loads between early-stage concrete slabs and shores. For analyzing the effect of weakened shoring layer on load distribution of reinforced concrete structures during construction, one simplified method is proposed, and verified by the results of engineering measurement. It is found that construction load carried by the slab above the weakened shoring layer is increased, and the construction load on the slab below the weakened shoring layer is decreased. The measurements for one high-rise concrete building during construction, indicate that the load carried by the slab above the weakened shoring layer is increased by about 4.3 percent, and the load carried by the slab below the weakened shoring layer is decreased by about 3.9 percent. Therefore, weakened shoring layer should be avoided to reduce the risk of reinforced concrete structures during construction.
出处 《工程力学》 EI CSCD 北大核心 2005年第4期137-141,共5页 Engineering Mechanics
基金 中国博士后科学基金资助项目(2003033159) 国家自然科学基金资助项目(50378051)
关键词 钢筋混凝土结构 施工阶段 模板支撑 薄弱层 分析 测试 reinforced concrete structures weakened shoring layer construction process shores analysis measurement
  • 相关文献

参考文献11

  • 1K Neilsen.Load on reinforced concrete floor slabs and their deformation during construction [R].Bulletin No.15 Final Report,Swedish Cement and Concrete Research Institute,Royal Institute of Technology,Stockholm,1952.
  • 2Grundy P,Kabaila A.Construction loads on slabs with shored formwork in multistory buildings [J].ACI Journal,1963,60(12):1729~1738.
  • 3Xi-L.Liu Wai-Fah Chen and Bowman M D.Construction load analysis for concrete structures [J].ASCE,Journal of Structural Engineering,1985,111(5):1019~1036.
  • 4Pericles C Stivaros,Grant T Halvorsen,Shoring /reshoring operations for multistory buildings [J].ACI,Journal of Structure,1990,87(5):589~596.
  • 5Dong-Ping Fang,Chuan-Dong Geng,Hong-Yi Zhu,Xi-La,Liu.Floor load distribution in reinforced concrete buildings during construction [J].ACI,Structural Journal,2001,98(2):149~156.
  • 6Agarwal R K,Gardner N J.Form and shore requirements for multistory buildings [J].ACI Journal,1974,71(11):559~569.
  • 7D Rosowsky,T W Philbrick Jr.,D Hoston.Observations from shore load measurement during concrete construction [J].Journal of Performance of Constructed Facilities,Feb.,1997,11(1):18~23.
  • 8A W Beeby.The forces in back-props during construction of flat slab structures [J].Proceedings of Civil Engineering Structures & Buildings,2001,146(3):307~317.
  • 9Dong-Ping Fang,Hong-Yi Zhu,Chuan-Dong Geng,Xi-La Liu.On-site measurement of load distribution in reinforced concrete buildings during construction [J].ACI,Structural Journal,2001,98(2):157~163.
  • 10Ming-zhu Duan,Wai-Fah Chen.Improved simplified method for slab and shore load analysis during construction [R].Project report:CE-STR-95-24,Purdue University,1995.

二级参考文献12

  • 1P C Stivaros, G T Halvorsen. Equivalent frame analysis of concrete buildings during construction[J]. Concrete International ACI, August, 991, 13(8):57-62.
  • 2K Neilsen. Load on reinforced concrete floor slabs and their deformation during construction [R]. Bulletin No.15 Final Report, Swedish Cement and Concrete Research Institute, Royal Institute of Technology, Stockholm, 1952.
  • 3Grundy P and Kabaila A. Construction loads on slabs with shored formwork in multistory buildings[J]. ACI Journal, 1963, 60(12): 1729-1738.
  • 4Xi-L Liu Wai-Fah Chen and Bowman M D. Construction load analysis for concrete structures[J]. ASCE, Journal of Structural Engineering, 1985, 11(5): 1019-1036.
  • 5Xi-L Liu Wai-Fah Chen and Bowman M D. Shore-slab interaction in concrete buildings[J]. ASCE, Journal of Construction Engineering and Management, 1986, 112(2): 227-244.
  • 6M Z Duan, W F Chen. Design guidelines for safe concrete construction [J]. ACI, Concrete International, 1996, 18(10): 44-49.
  • 7赵宪忠.[D].上海: 同济大学,2000.
  • 8中华人民共和国国家标准.建筑结构可靠度设计统一标准(GB50068-2001)[S].[S].,2002..
  • 9巴松涛,贡金鑫,佟晓利.钢筋混凝土结构施工期可靠性分析方法[J].大连理工大学学报,2000,40(4):479-482. 被引量:26
  • 10方东平,耿川东,祝宏毅,刘西拉.施工期钢筋混凝土结构特性的计算研究[J].土木工程学报,2000,33(6):57-62. 被引量:27

共引文献33