期刊文献+

一种制订孤立系统和辐射形互联系统机组检修计划的新方法 被引量:2

A New Method of Generating Unit Maintenance Scheduling for Isolated and Radially Interconnected Systems
下载PDF
导出
摘要 本文针对目前各种制订发电机组检修计划方法的缺点,提出了一种新的方法。并将该方法推广到制订辐射形互联系统机组的检修计划,还制订了孤立IEEE-RTS系统、两互联IEEE-RTS系统以及华中电网四省互联系统的机组检修计划,其结果是令人满意的。 In this paper, a new method of generating unit maintenance scheduling is presented, which is based on Gram-Charlier expansion. By this method, there is no need for computing ELCC, as other methods do. The proposed method directly combines the calculation of reliability index LOLP with the unit maintenance scheduling, because the calculation of LOLP is very simple and fast,and gives correct result by Gram-Charlier expansion if properly used. The method has been applied to single IEEE-RTS, two interconnected IEEE-RTS and Central China's Power System. The given results are satisfactory. The proposed method may find its wide applications in China, for the generating unit in China's power systems is small in size, large in both number and FOR.
作者 陈刚
出处 《中国电机工程学报》 EI CSCD 北大核心 1989年第3期34-40,共7页 Proceedings of the CSEE
  • 相关文献

参考文献1

  • 1居凯,1986年

同被引文献23

  • 1丘昌涛 岳占明 李朝华.用等风险度法制定发电机组检修计划的计算机程序.东北电力学院学报,1983,:83-93.
  • 2Kendall M, Smart A. The advanced theory of statistics[M]. London: Charles Griffin, 1977: 1-10.
  • 3Tian W D, Sutanto D, Lee Y B, et al. Cumulant based probabilistic power system simulation using Laguerrc polynomials[J]. IEEE Transactions on Energy Conversion, 1989, 4(4): 567-574.
  • 4StremelJP, JenkinsRT. Maintenance scheduling under uncertainty [J]. IEEE Trans on Power Apparatus and Systems, 1981, 100(2): 460-465.
  • 5Booth R R. Power system simulation model based on probability analysis[J]. IEEE Trans on Power Apparatus and Systems, 1972, 91(1): 62-69.
  • 6Rau N S, Toy P, Schenk K F. Expected energy production costs by the method of moments[J]. IEEE Trails on Power Apparatus and Systems, 1980, 99(5): 1908-1917.
  • 7Subcommittee P M. IEEE reliability test system[J]. IEEE Trans on Power Apparatus and Systems, 1979, 98(6): 2047-2054.
  • 8江帆 阎超.按最大累积容量裕度制定发电机组检修计划.重庆大学学报,1986,.
  • 9Kendall M, Stuart A. The advanced theory of Statistics [ M]. London : C. Griffin, 1977.
  • 10Tian W D, Sutanto D,Lee Y B, et al. Cumulant based probabilistic power system simulation using Laguerrepolynomials[J]. IEEE Transacti on sonEnergy Conver- sion, 1989,4(4) :567 -574.

引证文献2