期刊文献+

地下连续墙深基坑开挖与纵向地下管线保护 被引量:42

Protection of Longitudinal Underground Pipe Lines during the Diaphragm Wall Deep Excavation
下载PDF
导出
摘要 首次采用空间8节点非协调等参元方法,研究地下连续墙深基坑开挖过程中土体沉降沿基坑纵向的分布规律,并与上海地铁一号线徐家汇地铁车站的实测结果进行比较;引进了沉降传递系数的概念,据此可根据地表沉降值估算地下管线变形值,以保护沿基坑纵向的地下管线安全.所得结论可供工程技术人员参考. In this paper, a 3D 8-noded non-conforming isoparametric FEM is first used to analyse longitudinal distribution rules for soil settlement during diaphragm wall deep excavation. The results are compared to the in-situ testing results from Xu Jia-hut Subway Station in Shanghai Subway No. 1 Lines, proving the theory is reasonable. The coefficient of settlement transmission To is introduced. The To formulation is obtained. Based on To idea, the settlement of underground pipe lines may be calculated from the surface settlement, thus the underground pipe lines can be protected. The conclusions may be refered by engineers.
出处 《同济大学学报(自然科学版)》 EI CAS CSCD 1995年第5期499-504,共6页 Journal of Tongji University:Natural Science
基金 上海市建设技术发展基金
关键词 地下连续墙 深基坑 地下管线 开挖 保护 Non-conforming isoparametnric FEM Diaphragm wall Coefficient of settlement transmission
  • 相关文献

参考文献1

  • 1张有天,第四届全国岩土力学数值分析与解析方法讨论会论文集,1991年

同被引文献251

引证文献42

二级引证文献329

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部