3Malik M A K. Reliable Preventive Maintenance Scheduling[J]. AIIE Transaction, 1979,11 ( 3 ) : 221-228.
4Lie C H,ChunY H. An Algorithm for Preventive Maintenance Policy[J]. IEEE Transactions on Reliability, 1986,35 ( 1 ).
5Jayabalan V, Chaudhuri D. Optimal Maintenance-Replacement Policy under Imperfect Maintenance[J]. Reliability Engineering and System Safety, 1992c, 36:165-169.
6Martorell S,Sanchez A, Serradell V. Age-dependent Reliability Model Considering Effects of Maintenance and Working Conditions[J]. Reliability Engineering and System Safety, 1999, (64) : 19-31.
7Tsai Y T, Wang K S, Teng H Y. Optimizing Preventive Maintenance for Mechanical Components Using Genetic Algorithms [J]. Reliability Engineering and System Safety, 2001, (74) :89-97.
8Suresh P V, Chaudhuri D. Preventive Maintenance Scheduling for A System with Assured Reliability Using Fuzzy Set Theory, International Journal of Reliability, 1994,30 (4) : 407-513.
9LimJae-Hak, Park Dong Ho. Optimal periodic preventive maintenance schedules with improvement factors depending on number of preventive maintenances[J]. Asia-Pacific Journal of Operational Research, 2007,24 ( 1 ) : 111-124.
10Chen Y M,Wang M T,Yang C S, et al. The Optimal Policy for the Periodic Preventive Maintenance with Age Reduction Effect [C]//The 4th Asia-Pacific Conference on Industrial Engineering and Management System, Taipei, Taiwan(2002b).