期刊文献+

集约生产计划问题参数规划模型的转换与分解算法 被引量:2

Transformation and Decomposition Algorithm for Parametric Programming Model of Aggregate Production Planning
原文传递
导出
摘要 为求解模糊的集约生产计划问题,从模糊集约生产计划已清晰化后的参数规划模型着手,将参数规划模型进行分解,提出了分解算法,并将分解算法与分枝定界法进行了比较分析,仿真结果验证了这种算法的有效性与优越性. In the aggregate production planning in fuzzy environment, a decomposition algorithm is presented to solve the model by decomposing the parametric model into a series of sub-problems. The parametric model is a crisp one equivalent to fuzzy aggregate production planning. The effectiveness and superiority are proved by simulation results of experiments.
出处 《系统工程理论与实践》 EI CSCD 北大核心 2005年第8期92-96,共5页 Systems Engineering-Theory & Practice
基金 国家自然科学基金(70471028) 三峡大学校级科研基金(8248)
关键词 集约生产计划 参数规划技术 0-1混合整数规划 分解算法 规划模型 分枝定界法 仿真结果 解模糊 清晰 aggregate production planning parametric programming model 0-1 mixed integer programming decomposition algorithm
  • 相关文献

参考文献6

  • 1Tang J, Wang D, Fung R. Fuzzy formulation for muli-product aggregate production planning[J]. Production Planning and Control, 2000,11(7): 670-676.
  • 2Fung R Y K, Tang Jiafu,Wang D. Multi-product Aggregate Production Planning with Fuzzy Demands and Fuzzy Capacities[J]. IEEE Trans on Systems, Man and Cybernetics-part A,2003, 33(3):302-313.
  • 3Stockton D J. Quinn L. Aggregate production planning using genetic algorithms, Proceedings of the Institution of Mechanical Engineers Part B[C]. Journal of Engineering Manufacture 209 B3, 1995,201-209.
  • 4Filho O S. Silva. Aggregate production planning model with demand under uncertainty[J].Production Planning and Control,1999,10(8):745-756.
  • 5Kogan K,Khmelnitsky E,Maimon O. Balancing facilities in aggregate production planning: Make-to-order and make-to-stock environments[J]. International Journal of Production Research,1998,36(9):2585-2596.
  • 6唐加福,汪定伟,许宝栋.多品种集约生产计划问题的模糊方法[J].管理科学学报,2003,6(1):44-50. 被引量:20

二级参考文献1

共引文献19

同被引文献9

  • 1冯德鸿,朱建军.集约生产计划问题最佳平衡模型的仿真分析[J].系统仿真学报,2006,18(8):2119-2121. 被引量:2
  • 2Hax A C, Meal H C. Hierarchical Integration of Production and Scheduling [M]. M A Geisler. Logistics. Amsterdam, The Netherlands: North-Holland, 1975: 53-69.
  • 3Fung R YK, Tang Jiafu, Wang D. Multi-product Aggregate Production Planning with Fuzzy Demands and Fuzzy Capacities [J]. IEEE Trans on Systems, Man and Cybernetics-part A: Systems and Humans (S 1083-4427), 2003, 33(3): 302-313.
  • 4Filho O S Silva. Aggregate production planning model with demand under uncertainty [J]. Production Planning and Control (S0953-7287), 1999, 10(8): 745-756.
  • 5Fung R Y K,Jiafu Tang,Dingwei Wang.Multiproduct Aggregate Production Planning with Fuzzy Demands and Fuzzy Capacities-Part A:Systems and Humans (S1083-4427).2003,33(3):302-313.
  • 6Tang Jiafu,Richard Fung,et al.Fuzzy Modeling and Simulation for aggregated production planning[J].International Journal of Systems Sciences,2002.(in revision)
  • 7唐加福,汪定伟,许宝栋.多品种集约生产计划问题的模糊方法[J].管理科学学报,2003,6(1):44-50. 被引量:20
  • 8唐加福,董颖,刘士新,汪定伟.模糊需求和模糊能力约束的集约生产计划[J].控制理论与应用,2003,20(6):894-896. 被引量:7
  • 9董颖,唐加福,许宝栋,汪定伟.交互式多准则模糊集约生产计划[J].信息与控制,2004,33(2):156-161. 被引量:3

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部