摘要
文章简要论述了地铁区间施工方法的特点及适用条件,并结合北京地铁四号线的工程实践,分析了盾构法在地铁区间施工中的控制和影响因素。
The paper briefly introduces the features of the construction options for the transit metro tunnels and their adaptive conditions, analyses the control factors and factors of influence on the shield tunneling of the transit metro tunnels in accordance with the practice of the line No. 4 of Beijing metro.
出处
《现代隧道技术》
EI
北大核心
2005年第4期1-4,24,共5页
Modern Tunnelling Technology
关键词
北京地铁
区间工法
盾构法
Beijing metro
Construction options for transit tunnels
Shield tunneling