摘要
针对中坊水库大坝左岸的渗漏问题,在钻探的基础上,采用物探CT手段,结合成熟的砼水下成墙施工工艺,较好地解决了渗漏问题.
Aimed at the seepage problems of the left bank of the dam of Zhongfang reservoir, based on the geology drill hole and the physical detection, we adopted the construction technology of building the concrete wall underwater to treat the seepage.
出处
《江西水利科技》
2005年第B06期23-24,共2页
Jiangxi Hydraulic Science & Technology
关键词
中坊水库
渗漏
防渗处理
Zhongfang reservoir
Seepage
Anti-seepage treatment