摘要
详细介绍了华能大连电厂一期工程2号炉电除尘器增效改造的方法和取得的良好效果。
The scheme of efficiency increasing reform for ESP of 350 MW unit in Dalian Power Plant is introduced. The results indicate that the reformation is successful.
出处
《电力环境保护》
2005年第3期20-22,共3页
Electric Power Environmental Protection