摘要
结合具体的工程概况,分析了不良地质现象对工程的危害性,介绍了岩溶地区复杂高层建筑基础的选择,并对超前钻探的布置,桩基承载力的计算,以及土洞、溶洞的处理技术作了阐述。
Combined with specific engineering, it analyzes harmfulness to project of bad geology, introduces selection on foundation form of high building in karst zone, and illustrates arrangement of lead-drill ,calculation of load on pile foundation,processing technique of soil cave and solution cavity.