摘要
光照水电站坝址两岸地形较陡,原始地形中可供布置的施工场地较少。在弃渣场的选择过程中,有意识地在大型的山沟、凹地处,填造出成规模的施工场地,以满足施工临时设施与永久设施的布置要求。文中主要介绍了光照水电站渣场的设置、土石方平衡、综合利用及治理,其经验可供同类工程借鉴。
As the space for the layout of the construction site within the original terrain is limited due to the steeper terrain between the banks at the site of Guangzhao Hydropower Station, some large gullies, ravines and low-lying areas are intentionally backfilled with the excavated spoil material for the construction site during the selection of the spoil area in order to meet the layout demands of both the temporary and permanent construction facilities concerned. The layout, balance of earth-rock work, comprehensive utilization and improvement of the spoil area are introduced herein, of which the experience can be used by the other similar projects for reference as well.
出处
《水利水电技术》
CSCD
北大核心
2005年第9期58-61,共4页
Water Resources and Hydropower Engineering