本文对连续刚构桥箱梁在施工阶段各工况下0#决顶板、底板、腹板和横隔板作了空间应力分析,计算中计入了收缩、温度和时间效应的影响,对不同施工方法作了对比分析,从而获得施工过程次应力的准确分布规律,为0# 块优化设计积累了经验。
This paper makes a comprehensive analysis about the zero segment and the main contents are as follows: Analysis of 3D stress on the deck, web and bottom plate of the zero segment.Since shrinkage, temperature and time-dependent are considered during the calculation of 3D stress, this paper gets accurate secondary stress distribution pattern during the construction and provide a reliable foundation for optimal design of the segment.